Bridge 114 (1960)
Replacing a railway bridge over a main road in 15 1/2 hours between the last train on Saturday night and the first on Sunday morning, at Amersham, Buckinghamshire, so as not to disturb the scheduled train services.
Director: R.K. Neilson-Baxter
| Directing | R.K. Neilson-Baxter | Director |